Quick answer: Hybrid flooring is a floating click floor, so you don't glue or nail it down. Check the subfloor is flat and dry, acclimatise the boxes for 48 hours, leave a 10mm expansion gap around the edges, click the planks together row by row with staggered joins, then cover the gap with scotia or skirting. A handy person can do a 20 m² bedroom in a day. If you'd rather hand it over, our team installs across the Mid North Coast and quotes for free.

Before you start

  • Order 10% extra for cuts (20% for herringbone). Our room measuring guide shows how to get the m² right, and every product page works out the boxes for you.

  • Let the boxes rest in the room for 48 hours, flat, out of direct sun.

  • Gather tools: tape measure, pencil, square, spacers (10mm), a tapping block, a pull bar, a rubber mallet, a jigsaw or drop saw, a utility knife, and knee pads.

  • Read the box. Each range has its own click system and recommended expansion gap. Follow it over anything here if the two disagree.

The layers of a hybrid plank, cut end
The layers of a hybrid plank, cut end

Step 1: check and prepare the subfloor

Hybrid floats over concrete, tiles, timber floorboards, particleboard and most existing hard floors. The subfloor needs to be:

  • Flat: no more than 3mm of dip over a 2 metre straight edge. Fill low spots with a levelling compound; grind or sand high spots.

  • Dry: concrete must be fully cured and dry. On a slab, roll out a moisture barrier if your range doesn't have one built in. Our moisture barrier guide explains when it's needed.

  • Clean and solid: sweep, vacuum and fix any loose boards or tiles.

Going over tiles? Grout lines deeper than 3mm should be skimmed. Here's how hybrid over tiles works.

Step 2: plan the layout

  • Run boards along the longest wall or towards the main window. Our floorboard direction guide makes the call easy.

  • Measure the room width and work out your last row. If it would be narrower than 50mm, trim the first row so the first and last rows are a similar width.

  • Undercut door jambs and architraves with a hand saw laid flat on an offcut, so the plank slides underneath for a clean finish. See door frames and doorways.

Step 3: lay the first row

  1. Start in a corner with the tongue side facing the wall (or as the box says).

  2. Place 10mm spacers between the plank and the wall. This expansion gap matters: it lets the floor move with the seasons.

  3. Click the short ends together along the first row. Cut the last plank to length, keeping the offcut if it's longer than 300mm to start the next row.

Step 4: click the rows together

  1. Start row two with the offcut from row one, so the end joins are staggered by at least 300mm.

  2. Angle the long edge of the new plank into the previous row, lower it, then tap the short end home with the tapping block.

  3. Keep spacers in at every wall. Check the rows stay straight every few rows with a string line or a long level.

  4. Cut around pipes and obstacles with a jigsaw, leaving the expansion gap all round.

Step 5: the last row and trims

Measure the last row at several points, cut it to width, and use the pull bar to click it in against the wall. Remove all spacers.

Cover the expansion gap with colour-matched scotia against existing skirting, or remove and refit the skirting over the floor. Our scotia guide shows how. Use T-mouldings in doorways between rooms and a reducer where hybrid meets a lower floor. Here's how transition strips work.

Spotted Gum hybrid, installed by Reno Flooring in Yamba NSW
Spotted Gum hybrid, installed by Reno Flooring in Yamba NSW

Mistakes that are easy to avoid

  • No expansion gap, or filling it with silicone. The floor needs to move.

  • Skipping acclimatisation. Two days in the room saves gaps later.

  • Ignoring a dip in the subfloor. Fill it before you lay.

  • Lining up end joins. Stagger them by 300mm or more; it looks better and it's stronger.

  • Fixing furniture or cabinets through the floor. Kitchens go in first, floor runs up to the kickboard.

Our DIY mistakes to avoid article covers these in more detail.

DIY or get it installed?

If your subfloor is flat, the rooms are square and you're happy with a saw, hybrid is one of the most forgiving floors to lay yourself, and buying supply only saves the labour. If there are stairs, lots of doorways or an uneven old floor, a professional install is quicker and comes with one company responsible for the result. On the Mid North Coast, the free measure and quote tells you the installed price before you decide.

Next steps

 
 
 

Comments


Ready when you are

Measured, quoted and installed.

Book a free measure and we’ll come to you, check the subfloor and give you a written quote. No obligation.

Free samples

See it in your own light.

Order up to 3 free samples and compare them at home, next to your walls and furniture.

bottom of page