
DIY GUIDE
DIY flooring
Click floors were made for people who'd rather do it themselves. No glue, no nails, no sanding, and the whole job for an average living room fits in a weekend. Thousands of our customers buy supply-only and install their own hybrid or laminate. This page is what we tell them.
01
Which floor is easiest to install yourself
Hybrid is the easiest. Rigid boards, underlay already attached, click together, and it can go straight over tiles. Cuts with a jigsaw or a hand saw. Hybrid range.
Laminate is close behind. Lighter boards, a separate underlay to roll out first, and a scoring tool cuts it cleanly. Laminate range.
Engineered oak also clicks, but the boards are heavier and the timber is unforgiving of a rough subfloor. A confident DIYer manages it; a first-timer should start with hybrid. Engineered range.
02
Tools you need
Tape measure, pencil, square, spacers (10mm), a tapping block and pull bar, a rubber mallet, a jigsaw or hand saw, a utility knife for underlay, and knee pads. A mitre saw makes the end cuts faster but isn't essential. For hybrid, a scoring knife and a snap works for straight cuts.
03
Before you start
Measure the rooms and run the flooring calculator: add 10% for cuts, order full boxes, and keep one spare box.
Check the subfloor is flat within 3mm over 2 metres, dry and solid. Fill dips, grind high spots, and screw down any loose boards.
Leave the boxes flat in the room for 48 hours so the boards reach room temperature.
On a concrete slab, lay a moisture barrier. Under laminate or engineered, roll out underlay. Hybrid has its own.
Undercut door jambs so the floor slides under them instead of being cut around them. It's the detail that makes a DIY job look professional.
04
Installing it
Start along the longest, straightest wall, with spacers against it. Plan the layout so the last row isn't a sliver: if it would be under 60mm, trim the first row.
Angle the long edge of each board into the previous row, then tap the short end home with the block. Stagger end joins by at least 300mm.
Keep the 10mm gap at every wall, pipe and fixed cupboard. Floating floors move, and the gap is what stops them buckling.
Cut around door frames, vents and pipes with the jigsaw. Measure twice; the offcut often starts the next row.
Fit the last row with the pull bar, remove the spacers, then fit scotia or skirting to cover the gap and trims at any doorway where the floor changes.
05
Where DIY goes wrong
No expansion gap (the floor lifts in summer). Skipping the 48-hour rest. Not checking the subfloor, so the joints click and creak. Forgetting the moisture barrier on a slab. Running one floor more than about 12 metres without a break joint. Every one of these is avoidable, and every one of them is in the guide in the box.
06
When to call us instead
Stairs, herringbone, very large open-plan areas and badly out-of-level slabs are where our own team earns its keep. In Coffs Harbour, Grafton, Brisbane, the Gold Coast and surrounding areas we install what we sell: book a free measure and we'll quote the whole job. Everywhere else, we deliver to your town and you or a local installer takes it from there; most installers quote straight off our product pages.
07
DIY flooring questions
How long does it take to install a floating floor yourself?
A 20 m² bedroom takes a first-timer half a day. A 60 m² living area is a weekend. Preparation is most of it.
Do I need special tools for hybrid flooring?
No. A tapping block, pull bar, spacers and a saw. A scoring knife handles most straight cuts on hybrid.
Can I install flooring over tiles myself?
Yes, and it's the easiest DIY job of all because the tiles are already flat and level. Clean them, check for loose ones, and float hybrid over the top.
What if I get stuck halfway?
Call us, Mon–Fri 7am–5pm. We install floors every week and we've seen the problem before.
Is DIY flooring covered by the warranty?
Yes, as long as it's installed to the manufacturer's guide: correct underlay, expansion gaps, subfloor preparation. The guide is in every box and linked on the product page.